Requirements and grants
From the requirements document to the analysis, and the grant that pays for it.
Hand Sentinel RF the document a customer or an agency gave you and the studies it calls for run on their own, with a proposed design and the deliverables you send back. When the project needs funding, hand it the funding notice and the same study becomes the evidence the application is written from.
What does this requirements document actually call for?
Requirements studies
Upload the document, a system specification, a scope of work or an agency's statement of needs, and it is read into a worksheet: every site with its coordinates and heights, the frequencies, the microwave hops, the coverage objectives, and the things the document leaves out. The studies it calls for then run on their own, a system design is proposed from them, each requirement is judged against the computed results, and the deliverables come back: a technical summary with every study's report behind it, a compliance matrix with your responses, the questions to put to the issuer, and a draft acceptance test plan.
- A proposed design for every site: the channels, the antenna, the transmitter power and the combining, with each value's source named, from the FCC record, the rule or your own library; after the analysis an engineer can change any design setting and run it again
- A channel plan per site: the ERP and antenna height the licensed incumbents leave room for on each candidate, channels picked from the whole candidate list with whoever blocks the rest named, channels the customer already holds read from its own FCC licenses, and repeater inputs paired with every output and spaced for the combiner or duplexer the site needs
- Site intermod across the whole transmitter list, third order included, at a quarter mile for land mobile and a mile for broadcast; RF exposure under OET Bulletin 65 at each proposed site; microwave studied only when the document asks for it or names no backhaul already in place
- Coverage reliability scored over the county or city the document names, from the Census boundary, instead of a circle around the tower; where the target is missed, the smallest fix that reaches it is tried for you, more height, more power, or a site on a registered tower near the weak tiles
- Every call sign and structure the document names is checked against the FCC record: status, frequencies, expiration, buildout, registered height and position, open NOTAMs; the named channels are screened at each site against the licensed incumbents
- Equipment and feature requirements are read against the spec sheets in your library, with the passage cited; the document itself is checked for contradictions, requirements with no measurable criterion, and named manufacturers without an 'or equal'
- A compliance matrix (XLSX and DOCX) with the computed status beside your comply, exception or clarify response, a numbered questions letter with page references, and a TSB-88 acceptance test plan from the same grid the study ran on; addenda are read with the original and their changes listed, and reminders go out ahead of the questions and response deadlines
Is there grant money for this project?
Grant applications
Upload the funding notice and it is read into a program worksheet: the deadlines, the award range, the cost share and what it is figured on, every narrative section with its length limit, the scoring criteria and their weights, and the attachments, with a checklist your team marks off. Link the requirements study for the project, and its proposed system, predicted coverage and site exposure, the customer's FCC licenses and your team's own facts become the evidence the application is written from.
- A budget with the cost share computed the way the notice states it, a percent of the project, a percent of the federal share or a ratio, checked against the award ceiling and the cost categories the notice allows, and downloaded as a workbook whose formulas still work
- Each narrative section drafted from the evidence with every fact cited, the numbers checked against the facts they cite, the length measured against the section's limit, and the open questions listed; your team's own wording is kept and exported in the narrative document
- A self-score sheet that lines each scoring criterion up with the section that answers it and where that section stands, and a revised notice read against the original with every change listed, your marks, facts, budget and text kept
- Reminders ahead of the questions and application deadlines. Sentinel RF prepares the application; the funding decision is the agency's
One project, worked once.
Link a grant application to the requirements study for the same project and the study's proposed system, tower sites, channels, predicted coverage, RF exposure and backhaul arrive in the evidence set already numbered, beside the customer's FCC licenses and the facts your team adds. The narrative cites the study's numbers instead of someone retyping them, and when the study is rerun the evidence follows.
What these are, and what they are not.
A requirements study is a planning analysis built from published models, real terrain and the FCC record. It sizes the system and shows the customer why; it does not replace a drive test on a system that has to be accepted, and it is not a stamped design. Sentinel RF is not an engineer of record, and on life-safety and public-safety designs the output informs licensed engineering review rather than standing in for it.
A grant application is prepared from the notice and your evidence, and your team reviews and submits it. Every drafted number is checked against the fact it cites, but the funding decision is the agency's, and nothing here promises an award.
Keep reading
Cited answers
Your service manuals, procedures and bulletins become a library every tech can ask. Every answer names the document and page, and it says so when the library does not cover the question.
Coverage studies
LMR area studies, contours, path studies, TSB-88 tile reliability, receive-site surveys, microwave paths and sectored CBRS sites, over USGS terrain at your actual site.
RF calculators
Site intermod, short spacing, AM protection, shared-site exposure and desense, Fresnel zones, coax loss, ERP and the small stuff. Five of them run free on this site.
FCC license search
A full, weekly-refreshed copy of ULS and the antenna structure register, with leases and market licenses included, searchable by callsign, licensee, FRN, frequency or area.
License monitoring
Watch lists for licenses and towers, lighting-outage alerts from the FAA feed, and area watches for new towers and licenses near you.
Run one on a document you already have.
Start a trial and upload a requirements document or a funding notice from your last project, and compare what comes back with what your team produced.